# How to remove a Baseline in ScheduleReader?

When you want to remove an already imported baseline, you need to do the following steps:

1. Click on the File Menu.
2. Go to the Baselines submenu.
3. To remove the desired baseline, click on the X button right next to it.

![image 1 21](https://schedulereader.com/wp-content/uploads/2025/10/image-1-21.jpg)