Report Activity Progress Updates From the Field

Send back your activity status updates from the field as proposal, so the scheduler can update the progress in Primavera plans.

How Progress Update Works in ScheduleReader

ScheduleReader enables project participants to insert updates for on-going activities contained within the XER or XML schedule from the Activities and Assignments Views.

The scheduler can then review the reported status of activities within the Excel file and choose whether to import the new values and update the original schedule in Primavera P6 or reject the proposals.

The activity update proposals, are inserted through ScheduleReader and saved in separate .xls /.xlsx file created while in progress update mode and saved on a location where the schedule file is located. This enables the scheduler to quickly gather the centralized feedback of each activity’s progress from all field members on the project in a ready to update format.

progress update preview

Designed to Improve Project Execution

Quality status reports and coordinated communication between project teams are two key factors to consider during the execution stage.

Project Scheduler

Prepares the schedule using Oracle® Primavera P6 and distributes it to the project team.

Team Members

Team members on site view the project plan and insert update proposals, which are saved in a separate .xls file.

Project Scheduler

Reviews and imports the .xls file in Oracle® Primavera P6 where they approve or reject the proposed changes.

Team Members Working on Site Send Progress Updates to Scheduler

With ScheduleReader project participants can view the project plan and preview their assigned activities in a Gantt chart and tabular view while working on site.

Through the Progress Update functionality they can insert proposal for activity updates in the following two views: ‘Activities’ and ‘Assignments’. The project parameters that can be updated include: % Complete, Actual Start, Actual Finish, Activity Status, Activity codes.

The update proposals are saved within an separate Excel (.xls) file next to the location of the original schedule, a shared location or a personal folder. This allows the feedback from multiple employees to be centralized in a single point of access, which eases the scheduler job to gather the status of the different activities in progress.

With the Progress Update feature, team members on the field can also insert proposals to add new Activities in progress or inform the scheduler which activities are canceled and should be deleted from the plan. They can also view their updates directly in the Gantt Chart and see how potential updates will impact the milestones in the project.

Two engineers on a construction site examining blueprints with steel structures in the background.

Schedulers Review Proposals and Update Project Progress in Primavera P6

Progress Update is designed to improve the communication between field workers and schedulers, as it provides project teams with a simple interface to propose activity updates without making any changes to the original schedule. The feedback is generated in a separate Excel file, which ensures no modification are made to the schedule by other project stakeholders.

The Excel file containing the activity update proposals in a ready to import format from all employees can be saved on single, shared location, from where the scheduler can easily access and accurately determine the status of each activity performed on the field.

Updating project progress through Excel in Primavera P6 is a widely used practice and ScheduleReader significantly simplifies this process for both schedulers and teams on the field.

After receiving the proposed activity updates, it is the project scheduler duty to review the team’s proposals and choose whether to accept and perform the updates in the scheduling software or reject the proposed changes.

Two business professionals engaged in a collaborative discussion over a laptop in a modern office setting.

Why Choose ScheduleReader Over PDF Files

Ready to Get Started?

See how the world’s best schedulers deliver astonishing results for their businesses with ScheduleReader™.