Open Any XER File in Seconds – No P6 License Required
ScheduleReader is the fastest way to open, view, analyze, and report on Oracle Primavera P6 project schedules. Just download, install, and open your .XER file.
No credit card required · All PRO features included · Windows & Mac
Trusted By Leading Companies
Open Your XER File in 3 Simple Steps
No database connection. No Oracle license. No learning curve. Your schedule data is viewable in under 3 seconds.
Download ScheduleReader
Get the free 15-day trial. The installer is under 100MB and includes every PRO feature.
Install & Launch
Run the installer on Windows or Mac. No database setup or configuration needed.
Open Your .XER File
Go to File → Open, select your XER or XML file, and view your full schedule instantly.
What Is a Primavera P6 XER Project File?
An XER file is the native export format of Oracle® Primavera P6, the enterprise project management suite used across construction, engineering, oil & gas, and infrastructure industries worldwide.
Each XER file contains the complete project schedule: activities, calendars, resources, WBS structures, relationships, and cost data — stored across 20 to 66 data tables depending on project complexity.
While Primavera P6 can open these files directly, it requires an expensive Oracle license and database connection. ScheduleReader opens XER files instantly as a standalone viewer — no license, no database, no complexity.
|
Category |
What It Contains |
|---|---|
|
📋 Activities |
Tasks, durations, start/finish dates, constraints |
|
📊 WBS |
Work breakdown structure hierarchy |
|
👥 Resources |
People, equipment, materials assigned to activities |
|
📅 Calendars |
Working days, holidays, shift patterns |
|
🔗 Relationships |
Predecessor/successor logic between activities |
|
💰 Costs |
Budgets, actuals, and earned value data |
|
⚠️ Risks |
Risk registers and impact assessments |
The Best Way to Open XER Files
ScheduleReader is purpose-built for project teams who need fast, reliable access to Primavera P6 schedule data.
Opens in Seconds
Load massive XER files instantly. No database connection required — it reads directly from the file.
Zero Learning Curve
Mirrors the Primavera P6 interface exactly. If you know P6, you already know ScheduleReader.
Read-Only Access
Your original schedule is never modified. Share with stakeholders without risking data integrity.
More Than a Viewer
Filter, group, sort, compare baselines, trace logic, and generate DCMA 14 reports — all built in.
Fraction of P6 Cost
Starting at $344/year vs. thousands for a P6 license. Give your entire team access for less.
Windows & Mac
Native applications for both platforms. Enterprise MSI deployment available for large teams.
Go Beyond Just Opening the File
ScheduleReader replaces static PDF printouts with interactive, dynamic schedule analysis.

Interactive Gantt Chart & Critical Path
Visualize your entire schedule through Activities, WBS, Resource, and Project views. Navigate relationships, track the critical path, and use Trace Logic to understand exact dependencies — without altering the original P6 file.
Progress Update: Field-to-Office Collaboration
On-site team members propose activity updates directly in ScheduleReader. Schedulers review and import structured updates back into P6 — eliminating hours of manual data entry and email chasing.


DCMA 14 Schedule Health Assessment PRO
Instantly audit schedule quality against the industry-standard DCMA 14-point assessment. Identify missing logic, excessive lags, and hard constraints that jeopardize project success — presented in a clean visual dashboard.
Opening XER Files: P6 vs. ScheduleReader
See why thousands of teams choose ScheduleReader to view their Primavera schedules.
|
Capability |
Oracle Primavera P6 |
ScheduleReader |
|
Open .XER files |
✓ |
✓ |
|
Open .XML files |
✓ |
✓ |
|
Requires database connection |
Yes |
No |
|
Requires Oracle license |
Yes ($$$) |
No — from $344/yr |
|
Setup time |
Hours |
Under 2 minutes |
|
Read-only (safe sharing) |
No — editable |
Always read-only |
|
P6 look & feel |
✓ |
✓ (100% match) |
|
Mac support |
No |
Yes — native app |
|
Silent MSI deployment |
Complex |
Yes — Enterprise ready |
Trusted by Project Professionals Worldwide
From P6 instructors to project controls managers, here’s why they chose ScheduleReader.










