Linear Scheduling View Now Available in ScheduleReader

We are pleased to announce the release of ScheduleReaderTM version 7.0. The 7.0 version update comes with a new Time-location Chart, a new addition available in the PRO version, enabling support…

ScheduleReader Newsroom2 min read

Linear Scheduling View Now Available in ScheduleReader

We are pleased to announce the release of ScheduleReaderTM version 7.0.

The 7.0 version update comes with a new Time-location Chart, a new addition available in the PRO version, enabling support for viewing complex projects created using the Linear Scheduling Method (LSM) within an Oracle® Primavera P6 environment.

time location chart

The time-location chart/diagram is a special view used in project plans in Civil Engineering and Construction (Traffic engineering, Highway engineering, Railway systems engineering, Tunnel Engineering) and Power engineering and construction (Power line construction).

Linear schedule primavera P6 reader

In addition to the new Linear Scheduling View, ScheduleReaderTM is also equipped with different views such as Activities, WBS/OBS, Resources, Assignments, Roles, Progress Update, Reports and Dashboards, which allow quick and complete overview to different sort of data contained within XER, XML and XLS project schedules.

ScheduleReaderTM has powerful filtering, tracking and reporting features, that allows users to dynamically view and interact with the project data as an alternative to sharing these project information in static file formats such as PDF. The release that followed is covered in Greater Support for Viewing Project Data.

ScheduleReaderTM is available for purchase and download as 15 – day Free Trial version.

Get started

Read Your Primavera P6 Schedules Without the Licence